![]() Reference: The minimum strength requirements are found in the following sections: Exemption: Different types of metals may be used together if a competent person determines that galvanic action won’t reduce the strength of any component to less than the minimum strength required. Make sure scaffold components made of different metals aren’t used together.Make sure a qualified person determines that modifying components in order to intermix them will result in a structurally sound scaffold.Make sure intermixed scaffold components: Fit together without force and maintain the scaffold’s structural integrity.Maintain structural integrity when intermixing scaffold components Done by experienced and trained employees selected by the competent person.ĭefinition: A competent person is someone who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to employees and has the authority to take prompt corrective measures to eliminate them.Supervised and directed by a competent person qualified in scaffold erections, moving, dismantling or alteration and.Make sure scaffolds are erected, moved, altered, or dismantled only when the work is:. ![]() Make sure scaffolds are erected, moved, altered, or dismantled by appropriate persons
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |